I have moved the application BP submitted to drill the exploratory wells in the Macondo, to it's own topic page located on the right-hand side of this page, it was taking too long to load the front page of the blog.
It's titled: " Macondo drilling application "
I will re-post it, broken into smaller sections, on the front page, bit-by-bit.
I moved all of my older posts into an archive section, also on the right-hand side of the page
Apologies, Isaac
No comments:
Post a Comment