Monday, August 2, 2010

How much mud, and how long is the first undamaged casing length ?

I still think if they have problems with mud being lost to any leaks in the bore, they can apply Faraday waves into the fluid to prevent the structure of the mud from " breaking " the gelled structure it may have established as it settles. It would provide much higher surface friction throughout the structure of the mud, ie: the face friction. The face between the casing and the mud would overall exhibit a higher overall " grab " factor due to random shifting particle positioning , ie:average face-friction gradient. 13ppg mud can exhibit density and weight changes up to 15ppg in localized pockets, it's: the reason I have been writing about binary fluids, aside from a personal interest. Muds are /can be, binary fluids, Non-Newtonian fluids, Newtonian fluids, etc, etc,

If and when they get hydrostatic equalibrium in a certain section of the bore above the first damaged area, but the mud cannot exert enough face tension against the casing walls, then it will start to loosen and disseminate into the oil flow it is trying to compress. It will be lost into the same areas that any mud will be lost to. If they apply Faraday wave...they can make the mud " stick " to the casing more than it normally would.

                                                       
                                                              Just a theory.












" A 18,000 column of 13 ppg mud will exert a bottom hole pressure of about 12,200 psi. Original reservoir pressure was 11,900 psi. But remember when they are pumping the mud the effective mud weight (ECD) could approach 14 ppg to 15 ppg. "

" The Calculation for hydrostatic pressure (HP) is weight of mud in ppg X 0.052 X True Vertical Depth.

The depth of the well is ~18,000 feet below sea level so ~13,000 feet of well.

The hydrostatic pressure will therefore be 13.2 X 0.052 X 13000 = 8923 psi. This will result in an overbalanced well assuming well integrity since the surface pressure is currently ~7,000 psi. "


                                                            Here's what it looks like









" Figure 1a (based on a government document) shows that the upper part of the well bore is protected by three strings of casing (36-, 28-, and 22-inch) and cement down to 7,937 feet (measured depth below sea level). A fourth string of 16-inch casing extends nearly from the well head to where it is cemented at 11,585 feet, but it is apparently hung inside the 22-inch casing at 5,227 feet, leaving a gap of 160 feet. The 16-inch pipe has a burst rating approximately equal to the current shut-in pressure of 6,900 psi (80% of rating), but the 22-inch pipe does not meet this standard. "

Drilling companies are required to "bake" any hydrogen in casing sections before reusing them in a drilling operation. It's standard. Otherwise the metal becomes embrittled. That's why I have been mentioning possible " stress cracking " as a possibility leading to a structural failure. Seeing all the sloppy practices from these guys come to light over the past 3 months...makes me wonder if they skipped this crucial step as well. I was asking about this 2 months ago at the Drum, but for some strange reason...they didn't know what I was talking about...even though it's common knowledge in the drilling industry.

I have my fingers crossed, But I think they can do it.








       
                                  Another






                          And one more











...but I think lower, much lower amplitude than the last video.lol.

Sunday, August 1, 2010

What's the holdup..?

This is getting hairy.....there are 2 relief wells, drilled very close in proximity to a damaged horizontally drilled wellbore. There are 2 wellbores that were drilled initially for the production. One had a collapse on to the drill bit, and was cemented and abandoned, one was the "successful" well. They are in close proximaty to each other. Then there is the possibility of leaking and drifting gas and fluids from the shut-in well.

There is the problem of "communication" in between the wellbores, both the original bores, and the relief well bores. It depends on what kind of plug and fluids were left in the first failed bore, and the geological features in the area, and it's proximity to the second bore. If there are any "gas cut " fluids in the failed bore, or any sections where the cement has spaced due to improper gas ratios, in the first bore, then there is the possibility of problems from that.

  Then there is the possibility of pressure " communication from the relief well to the wild well. If the pressure in the relief well is not high enough, then there will be a "communication " between the bores, in the direction of the relief well.. The higher pressure from the wild well can blow out the distance between the two bores easily if there is a fluctuation in pressure from the reservoir itself while they are getting close to milling into the outer casing. If the pressure and mud weight are too great, than they will communicate, possibly into the wild wellbore and frac' the reservoir,...again...... producing a massive amount of kick and accompanying gas, which in itself would raise the amount of gas-lift provided to the fluid in the wild bore....thus raising overall pressures., which could in turn cause a simultaneous blowout in between other bores in the area, depending on several factors.

                        So they could possibly cause a blowout into the releif well/s.

I understand they are going to use a 13ppg mud weight, water-based, for the initial "bull-heading effort" through the new "cap".

I this following MMS document, I found a PDF, describing a very similar scenario , in which there was a previous wellbore that had failed, as had the casing and concrete, and the outer areas outside the wellbore had started to erode under high pressure oil and gas flow. This two phrases caught my eye particularly.


" These wells have the potential of an uncontrolled release of hydrocarbons to the environment."

" It is concluded that the subsidence of Platform “A” may have resulted in casing/tubular buckling for Wells A-1/A-1D, A-2/A-2D and A-3/A-3D. "

                       
                            http://www.gomr.mms.gov/PDFs/2008/2008-053.pdf


It was describing the underground blowout and subsequent uncontrollable erosions outside a damaged bore.

...so...now, lets think about what has happened since they shut the well in.

Many people have noticed massive clouds and eruptions that seem to happening around the ROV's


   That is a valid observation, however you cannot disregard the possibility of a sub-floor blowout around the BOP...it is damaged at the mudline/bedrock...otherwise it wouldn't have been at a 15° lean. Although the interior casing sections may be only bent, the normally tight-fitting connection points comprised of the " shoe " may also have been pulled out of alignment past or above the point of stress. Creep under mudline, the " gas saturation zone " is normal in the event of shutting in a well. How much gas can it hold before it blows out, we may be seeing the start of it....or we may be seeing just silt being kicked up by ROV's....or would could be seeing silt being kicked up by the ROV's on purpose to obscure the venting incidents.....so I would not rule this out as being a " done deal " yet....if they have damaged the area from leaving it shut-in for too long, they may have created a situation in which they cannot proceed with the " static top kill ", although I also understand they are not going to proceed with the operation under extreme pumping pressures, as to not cause any further damage.

                                                  
                                                     Some things to think about.


A. The 2006 February quake originating in the area of the Horizon blowout, a little SE of it, actually.

" The seismograms are fit well by a model of sliding on a shallow, sub-horizontal surface within the thick layer of low-velocity sediments that blankets the Gulf of Mexico offshore region."

" low velocity sediments "
= slow gas drift vertically

" sliding on a sub-horizontal surface "
= rocks tend to be aligned in layers horizontally

" We modeled the observed surface waves using a single-force source (e.g., 5), often referred to in the academic literature as a "landslide"
source. "

http://www.onepetro.org/mslib/servlet/on...

-------------------

Insights into the mechanism of the Northern Gulf of Mexico MS 5.3 "Green Canyon event" of 10 February 2006
Authors:
Dellinger, J. A.; Blum, J. A.
Affiliation:
AA(Advanced Imaging Team, BP America, Houston, TX

" Although the Northern Gulf of Mexico is generally a region of low seismicity, it produced three earthquakes of magnitude 4.5 or greater in 2006, including a MS 5.3 event in the Green Canyon area on 10 February. This "Green-Canyon event" was of particular interest because of its proximity to offshore hydrocarbon exploration and production facilities "
--------------

A model for fluid-injection-induced seismicity at the KTB, Germany

" The 9.1 km deep KTB (Kontinentale Tiefbohrung, Germany) drilling hole is one of the best investigated deep-drilling sites in the world. Among other parameters, in situ measurements revealed continuous profiles of principal stresses, pore fluid pressure and fracture geometry in the vicinity of the borehole. The present study combines these parameters with hydraulic and seismicity data obtained during fluid-injection experiments conducted at the KTB to derive a conceptual model for fluid-injection-induced seismicity at the KTB. This model rests on the well constrained assumptions that (1) the crust is highly fractured with a permeable fracture network between 9 km depth and the Earth's surface and (2) the crust is in near-failure equilibrium, whereby a large number of fracture planes are under near-critical condition. "


http://www3.interscience.wiley.com/journal/118846782/abstract?CRETRY=1&SRETRY=0#ss4


....so they are going to use a light mud, water-based, this is an indication that the rock layers that the leaking in has a high pore count, enabling rapid drifting of fluids and gases. They do not want to frac' the reservoir, or the damaged bore any more than it has already been frac'ed

The cap may have, and probably does, imho, have a leg of gas, or a saturated/gas cut leg of fluid in the bore.


..The following was pasted from the comments at:


http://www.flickr.com/photos/uscgd8/4551846015/page63/#comment72157624626346300

BP will not use oil based mud on this, a) its too expensive, b) it entrains gas. c) They are not going to produce this well so formation damage is moot. d) It is even more environmentally unfriendly than crude oil.
"Lubricate and bleed" be done in a controlled and slow fashion that would not raise the pressure much? If they injected at a very low rate through the choke line (using a cement pump) while producing a similar amount of fluid through the kill line, the pressure rise would be minimized. They would have to inject at a rate of just gallons a minute, but if the fluid is dense enough some/most would be displaced down hole. Whether it would do any good is still to be seen.

Why not use heavy brine for the injection fluid in "Lubricate and bleed"? It would fall through the oil and slowly mix with the entrained formation water, but at least add to the hydrostatic head and lower the pressure (if it is falling in the oil flow path).
That's how it works, they will be there trying to kill this thing this time next year.
If they try and bump and bleed at the same time the mud will just flow across the stack and back up to surface, that's what they accomplished with the first top kill ... waste of mud and time.

" lubricate and bleed kill methods are for gas wells "

My concern is that something else will give before the fracture initiation pressure is reached down in one of the weak shales in the open hole. The BHP of the sand is a good deal lower after the several million barrels of production and the weak zones are maybe hundreds of psi above where fracture initiation would occur.

If I understand this correctly, the ideal way to “lubricate and bleed” is to inject some heavy mud into a column of gas. Then the heavy mud falls through the gas and increases the hydrostatic head on the BHP, which lowers the pressures everywhere. The gas column/cap returns back to the top of the well and the process is repeated until the BOP pressure is greatly reduced. So if only we had a gas cap this might work – except we all agree that a gas cap is unlikely.
Of course the scenario of something other that a weak zone in the open hole breaking is the worst case and the reason other options would be taken. The fracture initiation pressure of any zone is in direct proportion to the reservoir pressure in the zone and so if the pay zone has been drawn down, and it has, then the payzone will likely be the zone that will fracture and the oil will simply go back from whence it came. That is what will happen.

Yes, under the gas well scenario the lubricate and bleed method works great and quickly. When the fluid is heavier it takes longer for the fluids to redistribute and stabilize and it would take a very long time to accomplish a lubricate and bleed. They likely would simply keep bullheading once they realize how easy it is.

Like I said before, the reason they won't to do the bottom kill method is that they, unlike us here, have not figured out that the blowout was flowing up the annulus and so there bottom kill would involve milling casing whereas it isn't necessary.
The 7" could be holed by now given the time and flow rate, it 's possible it has washed out opposite the producing zone, and or, the 9-7/8" liner shoe. These are the two places where the annular velocity is the highest. I would imagine there is not much left of the casing hanger either.

From the reports this morning it seems the hole on relief well #1 has sloughed in on them during the non-storm. Most likely it is sloughing because of the pressure build up in the surrounding formations because of them having the Macondo shut in.

I hope the genius' realize that before they drill much closer to the well bore, or we will be drilling another relief well for the relief well.

http://www.ndt-ed.org/EducationResources/CommunityCollege/Materials/Structure/fatigue.htm
The Effect of Fluid Loss on Fracture Initiation During Squeeze Cementing Operations

http://www.onepetro.org/mslib/app/Preview.do?paperNumber=00019384&societyCode=SPE
HYDRAULIC FRACTURING

http://spe.org/spe-site/spe/spe/jpt/2007/03/Syn103232.pdf

If I understand it correctly, in the bottomkill without returns to the surface, the pumped mud/cement would flow to the weakest zone (probably the pay sand now). So there could still be a column of cement from the penetration point of the relief well down to the pay zone, at least in the annulus. But a concern would be if there were holes in the lower and upper casing that provided alternate flow paths. We have no idea what shape the production casing is in.

The entire “lubricate and bleed” idea is foolish with the relief well so close to being useful. Increasing the pressure on the system is the opposite of what they should be doing.

Excerpts from today’s NYT:

-quote

Officials Optimistic That Cement Will Kill BP Well
By CLIFFORD KRAUSS
The static kill, also known as bullheading, is part of a two-pronged strategy to kill the well by cementing it shut twice, once from above with the static kill and then from below, using a relief well.
The approach has been compared by some engineering experts to the folkloric efforts to kill vampires.

“The well can only be killed from the bottom up,” Admiral Allen told reporters last week.
Still, he added, the static kill is important in large part because it can help determine the stability of the well. If there is a sudden drop in well pressure as mud is pumped into the pipes, that could mean there is a leak somewhere in the well. In that case technicians could seek out the leak with seismic work and other diagnostic testing, and then tackle those leaks with the cement pumped in through the relief well.

“No one has come out and said the well has full integrity,” said Greg McCormack, program director of the Petroleum Extension Service at the University of Texas, Austin, suggesting that it was still possible for the well to leak before the relief well was completed. For that reason, he said, the static kill operation makes sense to potentially kill the well two weeks earlier than the relief well would.
“This is just an ultraconservative approach,” Mr. McCormack said, “and at this point in time we should be taking the most conservative approaches. I can’t see any risk.”

-unquote

-------------------------------------------- -----------
“This is just an ultraconservative approach,” Mr. McCormack said, “and at this point in time we should be taking the most conservative approaches. I can’t see any risk.”

With petroleum “experts” like McCormack, we’re in trouble. It’s scary that they get quoted in the press while the sensible approach only got one line and were referred to as “some engineering experts”.
BP still wants to cement the BOPs up so they can't be retrieved,
That is the only logical conclusion.

Any person that has ever killed a well, knows you can't do it the way they are saying, it simply will not work.

Leaving 9/10ths of the hole full of gas cut oil is not only stupid, it's insane, and illegal by MMS rules or whatever they call themselves now.

Plug the top after the well is dead.
Put a rig over the hole, fish out the junk, cut the casing and pull it out, and put a bridge plug in the hole, retrieve the BOPs, fill up the hole with cement, end of job finished.

There is no such thing as acceptable risk, you minimize the risk by proper engineering and planning to the point where it's just a difficult job at most.

It does seem like having the old hole available to flow out of when they flow cement into the relief well would be nice. To plug the old hole with cement before cementing from the relief seems bogus.

This is way past just plain dumb. It's almost like watching a kid trying to see how much he can get away with. Given where we are with the relief well, this is a new level of crazy. Surely the press got it wrong.
 ------------------------------------------------------


So, after reading those people who work in the industry, it gave me a good insight into what the potential problems might be here.

The events of erosion are time dependent, the longer they go on the worse they get. The events of erosion's under immense pressure, and high temperatures drifting through unknown natural fractures, and rock layers of various densities, and possible sand traps . With a highly sedimentary binary fluid containing suspended gases at different bubble points, moving at high pressure through who-the-hell knows-what...

There's only two event's that can happen....the holes get bigger....or the layers cave in and block any holes or paths. " Bridging "    After bridging occurs...that's only the fluid path really....the gases began to then drift , at different rates , according to rock pore counts....and then there are also many old bores in this area that have been cemented and abandoned in block 252.


Like many have said before...they knew it could happen, and probably would happen back in February. This event has , and is, being milked for every dollar, in every way.

 I feel like the longer they wait, the worse the potential screw-ups could be....good luck, guys.

Ken Wells and British Petroleum investors

                                           Please stop it Ken, you're scaring the children






 R.I.P. Kliban.

http://www.blackjelly.com/Mag/gallery/klibanhome.htm

Where do we really reside...?

   Hello Roman, Grüße zu meiner Familie in Europa .

   Here are 2 pictures for you. The universe, and the mind. I could not find the exact picture I was looking for...yet, but these are close enough. This is why I think we are living in the mind of... "God"....something I have believed since I was a child .......One is a rendering of the structure of neuronal pathways in the human mind, one is a picture of the structure of a deep-space nebula . ...the order of the universe....and everything contained within, all follow the same laws....the physical structure of the atrophy of the brain due to old age would also resemble the shape and structure of the collapse of the universe.....as science continues to look further in both directions...inner-space & outer-space, and our wider field of view becomes....wider.....we will find that the structures of what we see will be the same,....... perhaps every particle we see or " discover" is in itself another universe, and the particles that comprise them would be found to be the same.., and the entire universe we perceive is just a particle that has yet to even be discovered ,...and so on , ad infinitum...also an idea I thought of often as a child. ..I often question the concepts of reality, time, gravity.....I can only compare them to the 3 Stooges.




Saturday, July 31, 2010

Ultrasound destroys toxic liquid waste

 Well now that the Gulf of Mexico is even more of a toxic shit-stew than normal, I wanted to post this story about using ultrasound to take out toxic soups. For good.


 ..First this article.

   The image of a soprano shattering a crystal goblet with a prolonged high note sets the scene for Michael R. Hoffman, a chemist at the California Institute of Technology California Institute of Technology, at Pasadena, Calif.; originally for men, became coeducational in 1970; founded 1891 as Throop Polytechnic Institute; called Throop College of Technology, 1913–20.  in Pasadena.

Hoffman uses ultrasound to break down hazardous wastes in liquids. By subjecting toxic molecules in solution to the intense energies of ultrasonic vibrations, he finds that the toxins will separate into their nontoxic components.

Human beings can hear sounds up to 16 kilohertz One thousand cycles per second. See Hertz.  (kHz), or 16 thousand cycles per second. Above that threshold, ultrasound ranges from 16 kHz to several million hertz.

When focused into a liquid, ultrasonic vibrations generate tiny bubbles that superheat su·per·heat
tr.v. su·per·heat·ed, su·per·heat·ing, su·per·heats
1. To heat excessively; overheat.

2.
, expand, and collapse in only a few microseconds. Temperatures inside the bubbles can reach 5,500[degrees]C, causing complex molecules inside the fluid to break apart. Hoffman likens the process to liquid "incineration."

In one test, Hoffman's group exposed the pesticide parathion to ultrasound at 20 kHz, delivering 75 watts of energy per square centimeter. The entire sample broke down in 2 hours, quickening degradation from a half-life of 108 days to 30 minutes. A new apparatus delivers up to 3 million watts.

Hoffman also reports using this method to break down several nasty pollutants in the laboratory -- which suggests that PCBs, widely used in batteries, and solvents such as TCE and PCE should succumb as well.

   So, ....now, I realize that sound is damaging to marine life, excruciatingly painful for sonar-using mammals, and highly likely, fish too, as well as all the other marine life, although I have never found any information concerning the detrimental effects on a broader scale...figures. The sono-catalysis units that are used by many industries could be easily adapted for this method of what I like to call " sono-remediation".

The dispersed oil and other chemicals contained in the various layers of the ocean are being found at very different concentrations in the areas that are monitored. The various salt saturation levels, temps and currents in the deep-water areas are what are dictating the placement of the oil and "other " compounds.

   Given that sound travels extremely far in dense liquids, ie: salt water, same reason sonar works, I think that these units could be easily used. They would far more effective at dealing with the problem of suspended oil. The surface skimming we all know is highly ineffective, the oil, once dispersed, sinks beneath the surface of the water, but oil that has not been dispersed, will sink as well, as soon as it releases some of the gases contained. Since the upper layers of the ocean are much less dense than the lower layers, the oil naturally sinks, with or without dispersants. These units could be rigged up and towed under the ocean, or they could be set up in various layers of the Gulf sea-floor, for sono-remediations, where the currents, and sinking hydrocarbons would encounter the propagating sound waves traveling in the lower depths. I do not see fishing grounds being affected, simply for the reason that pretty much all the fishing in the gulf of Mexico is done at a much shallower level than where the layers in which the oil will be found in the coming months.

Just in the same way that sub-sea "trees" and "hubs" are built for transfer of oil, the same can be done with sono-units. They can also be specifically tuned to destroy various density materials, ie: the longer vs shorter chain hydrocarbon groups. Ultimately this could also become a way to keep marine life away from areas where toxic compounds are found in higher concentrations, limiting their entry into the food chain in the Gulf areas.

http://www.hielscher.com/ultrasonics/sonocatalysis_catalysis.htm

...so maybe Kevin Costner, or Jimmie Cameron.......or maybe even a joint group of the people that actually are responsible for all this tomfoolery ....GASP...hush yo' mouth child....could get together and maybe pony up some duckets for a sound operation.......

 Or we can just wait for nature to take her course...what ever that may be.